I spend the afternoon working on the hive box. I must say that over all I am frustrated that the work didn't go faster and I still don't have a working model of the top or bottom but I finally have the outside dimentions where I want them. Plus I fixed the issue with my last attempt and now the standard 19" topbar will now fit. While there are no official standard length of the topbar there is a regulation in Florida that all bee hives must have 19" frames. So I decided that would the my standard length.
While I do have both the top and bottom all drawn up in my head I still do not have them translated into wood. I hope to get another day soon to put the finishing touches together.
Sunday, February 28, 2010
Finally!
Posted by Curtis at 12:37 AM 0 comments
Sunday, February 21, 2010
Feeling the pressure of spring.
Spring is on the cusp here in Houston. I am feeling the pressure to get my new hives completed and my hives set for the new year. I have everything worked out on paper to complete this hive design. I believe it is finally done. I just need some time to complete the physical build.
Once this build is complete I will be able to put the entire plan into an assembly line type production. So I can get a cost analysis done.
Posted by Curtis at 11:59 PM 0 comments
Subscribe to:
Posts (Atom)